Building Information

As part of the Dania Pointe master plan, this residential expansion adds 336 luxury units in Phase II, complementing the initial 8-story 264-unit tower from Phase I. Our scope encompassed envelope and façade engineering: glazing and window-wall system detailing, anchor and fastener design, structural coordination, wind-pressure analysis, and shop drawing production. We ensured the design met code standards, performance expectations, and seamless integration with Phase I and adjacent mixed-use elements.

Packages Delivered

  • Full Exterior Glazing Shop Drawings

  • Full Exterior Railings Shop Drawings

  • Interior Glazing Shop Drawings

  • Compliance Packages for all the above

  • Field Fix Engineering Letters

Challenge

ES 8000 Storefronts, ES 5000 Casement, ES 9000 Swing Doors, EL-200 Sliding Window, EL-400 Sliding Glass Door, EL-150 Fixed Window, ES BF 5010T Bi-Fold Door, EP-1017 Post Railing System, CRL 450 Storefronts, CRL 250 Swing Doors, CRL Frameless Window Wall

Result

Results were given.

Latest Projects

Year

2023

Year

2023

Year

2023

Client

All American Windows

Client

All American Windows

Client

All American Windows

Industry

Facade & Glazing

Industry

Facade & Glazing

Industry

Facade & Glazing

Project Duration

7 weeks

Project Duration

7 weeks

Project Duration

7 weeks

Building Information

As part of the Dania Pointe master plan, this residential expansion adds 336 luxury units in Phase II, complementing the initial 8-story 264-unit tower from Phase I. Our scope encompassed envelope and façade engineering: glazing and window-wall system detailing, anchor and fastener design, structural coordination, wind-pressure analysis, and shop drawing production. We ensured the design met code standards, performance expectations, and seamless integration with Phase I and adjacent mixed-use elements.

Packages Delivered

  • Full Exterior Glazing Shop Drawings

  • Full Exterior Railings Shop Drawings

  • Interior Glazing Shop Drawings

  • Compliance Packages for all the above

  • Field Fix Engineering Letters

Challenge

ES 8000 Storefronts, ES 5000 Casement, ES 9000 Swing Doors, EL-200 Sliding Window, EL-400 Sliding Glass Door, EL-150 Fixed Window, ES BF 5010T Bi-Fold Door, EP-1017 Post Railing System, CRL 450 Storefronts, CRL 250 Swing Doors, CRL Frameless Window Wall

Result

Results were given.

Latest Projects

Year

2023

Year

2023

Year

2023

Client

All American Windows

Client

All American Windows

Client

All American Windows

Industry

Facade & Glazing

Industry

Facade & Glazing

Industry

Facade & Glazing

Project Duration

7 weeks

Project Duration

7 weeks

Project Duration

7 weeks

Building Information

As part of the Dania Pointe master plan, this residential expansion adds 336 luxury units in Phase II, complementing the initial 8-story 264-unit tower from Phase I. Our scope encompassed envelope and façade engineering: glazing and window-wall system detailing, anchor and fastener design, structural coordination, wind-pressure analysis, and shop drawing production. We ensured the design met code standards, performance expectations, and seamless integration with Phase I and adjacent mixed-use elements.

Packages Delivered

  • Full Exterior Glazing Shop Drawings

  • Full Exterior Railings Shop Drawings

  • Interior Glazing Shop Drawings

  • Compliance Packages for all the above

  • Field Fix Engineering Letters

Challenge

ES 8000 Storefronts, ES 5000 Casement, ES 9000 Swing Doors, EL-200 Sliding Window, EL-400 Sliding Glass Door, EL-150 Fixed Window, ES BF 5010T Bi-Fold Door, EP-1017 Post Railing System, CRL 450 Storefronts, CRL 250 Swing Doors, CRL Frameless Window Wall

Result

Results were given.